The new goal is to complete all of our yard infrastructure by Summer. A couple of Fridays ago I made significant progress towards this end by completing our middle patio. A month ago I dug down and leveled the patio, hauled the excess dirt to various other areas of the yard and moved 10 or so wheel barrow loads of gravel base. The following weekend I moved the remaining sand as well as the pavers that we had left after finishing our patio. To finish the area off, I leveled the pavers (24"x24" 'Broadway Pavers' from Bourget Brothers) and bought and moved the gravel (14, 100lb bags of 3/4"-1/2" Del Rio gravel from Throop).
middle patio - gravel base 2/13
middle patio - complete (mostly) 2/27
My next step is to finish edging and dressing the top of the vegetable bed broken concrete walls:
dressing concrete
After that I will finish the planter south of the patio, which includes weeding, drips for the future fruit trees, painting the fence, finishing and setting the electrical pullbox, backfilling and dressing the top of the broken concrete wall. This area will get a nice healthy layer of mulch - one thing I wish I had done comprehensively over our yard a long time ago.
planter south of patio
Next, clean, final grade and plant out of the middle hill:
middle hill - almost ready for succullents
Then the lower patio:
lower patio - lots of work needed here
Lastly, there is the lawn area as well as the lower planting beds. We also need to figure out where the chicken coop is going...